Products

We have been dedicated to broadcast control software development and services for over a decade, accumulating extensive product and project experience. Our products offer strong adaptability and are widely applied to system management and control in studios, playout, transmission, Master Control Room (MCR), earth stations, OB Vans (outside broadcast vans), satellite uplink vehicles / DSNG vehicles, flyaway stations, equipment rooms / machine rooms, and more. At the same time, we also provide comprehensive solutions for building large-scale broadcast command & dispatch centers.

Reservation System

Reservations and scheduling are both means of pre-planning and requesting resource usage. Scheduling corresponds to programs such as variety shows and sports events, and is a highly regular form of resource pre-allocation. Reservations, by contrast, are more spontaneous and carry greater uncertainty. Scheduling typically covers longer-term planning, such as the time a studio is used for a dragon boat race broadcast. Due to its regularity, scheduling tends to be batch-imported with only a pre-set time window required. Reservations are more flexible and ad-hoc, serving as a short-term resource request.

Asset Management System

Organizations invest substantial funds in purchasing various assets every year, yet over time it becomes difficult to know promptly and clearly how many assets the organization and its subsidiaries own, which departments they are distributed across, where they are stored, who is using them, and what condition they are in. Fixed asset utilization is often low, and duplicate purchases are common. When employees leave or change positions, asset handovers are frequently incomplete, making it hard to quickly and fully identify all assets in a person's custody, leading to asset loss. Unclear accountability, heavy audit and inventory workloads, and high error rates create many challenges for asset management departments. Discrepancies between records and physical assets, as well as significant gaps between book value and actual value, are common occurrences.

Task Control System

The task execution system receives and displays scheduled task information from the task management system in real time, issuing advance alerts so that on-duty operators can execute tasks at the designated times. It establishes signal routing paths and works in conjunction with equipment and signal monitoring systems to continuously monitor the operational status of all devices along the task route, ensuring correct signal delivery. When equipment faults occur or matrix states are in error, audible and visual alarms are triggered to prompt operators to resolve the issue. The system also allows operators to manually adjust task routing based on actual conditions, ensuring uninterrupted signal paths.

No online address available

Project Management System

The project management system is specialized software used by project managers to effectively manage all work involved in a project under limited resource constraints, applying systematic perspectives, methods, and theories. It covers the entire process from investment decision through project completion, encompassing planning, organizing, directing, coordinating, controlling, and evaluating to achieve project objectives.

Data Analysis

Data analysis refers to the process of applying appropriate statistical methods to analyze large volumes of collected data, extracting useful information and forming conclusions through detailed study and summarization. This process also supports the quality management system. In practice, data analysis helps people make informed judgments so that appropriate actions can be taken.

Cost Center

A cost center is a department or unit within a management accounting responsibility system that is responsible for collecting, controlling, allocating, accounting for, and evaluating incurred expenses. It is part of the responsibility center structure. From an organizational perspective, it can be a department, a business unit, an operating area, or even an individual. Regardless of the expense type or the level of cost center, each is accountable for its controllable expenses.

No more content

Screenshots on this page show the Chinese user interface. English materials are available on request.
E-mail: market@windica.cn  ·  We reply within 2 business days.